Tetap | Sementara | Sangat Sementara | n/a Tidak Tersedia 
# Jenis Data Tahun Satuan Sumber
2015201620172018201920202021
VIII. Drainase
1. Panjang Drainase Sistem Terbuka25.7825.7826.63n/an/an/an/a Meter Dinas PU PR
1. Kondisi Baik21.40921.40922.50122.75622.75622.756n/aMeter Dinas PU PR
2. Kondisi Sedang3.0423.0422.8042.2892.2892.289n/aMeter Dinas PU PR
3. Kondisi Buruk1.3311.3311.331559559559n/aMeter Dinas PU PR
2. Panjang Drainase Sistem Tertutup106.51106.51106.55n/an/an/an/a Meter Dinas PU PR
1. Kondisi Baik89.73289.73290.00591.29291.29291.292n/aMeter Dinas PU PR
2. Kondisi Sedang11.45511.45511.21811.21811.21811.218n/aMeter Dinas PU PR
3. Kondisi Buruk5.3275.3275.3275.3275.3275.327n/aMeter Dinas PU PR